Things have been moving along though. The plasters were here last week (creating more mess than I thought humanly possible.) The tilers arrived a few days afterwards (a far less messy bunch!). Tom and David are doing the painting together and it is taking far longer than we could have imagined.
Slowly, slowly the light at the end of the tunnel is beginning to appear. Peter from Parkview Cabinetry installed the laundry cabinetry on Friday (the cabinetry stage is always thrilling.) However we are still without a washing machine and surviving on the kindness of others to wash our clothes.
We are hoping to see the plumber and electrician back this week (but I am waiting on Reece to get my powder room basin in stock).
George needs to finish a few smallish jobs still (he has been pulled away on another job around the corner). But honestly we are almost there. I am hoping the nesting phase of pregnancy hits me six months early and turns me into a different person (an organised clean freak with endless amounts of energy to dust, mop and polish this house into shape.) Should happen any day now, right.
Tiling completed in the laundry (same tiles used in the ensuite.)
Laundry Cabinetry installed - my camera lens struggles to take photos in this room.Bedroom and study nook plastered - still a bit more work to do in this room.
Painting is 80% finished in the family room. Electrician decided to wait until the painting was finished before installing all the lights.
To all my wonderful friends who have been so very supportive during this build but are yet to be invited over for a bbq, dinner or drinks. I hope this photo explains why!